Skip to content
1-801-575-8801 info@utahscientific.com
Request a Demo
Broadcast Infrastructure TCO Calculator — Free Download | Utah Scientific

Free Worksheet · Broadcast Infrastructure

What Is Your Routing Infrastructure Actually Costing You?

A free 10-year Total Cost of Ownership worksheet for broadcast engineers and facility managers. Turn hidden warranty, power, rack space, downtime, and migration costs into verifiable numbers you can defend in a budget review.

What's inside

Six cost pillars that separate purchase price from true 10-year TCO: warranty, power, rack space, downtime, migration, and software
A worksheet for each pillar, with the Utah Scientific column pre-filled from published specs — you only need to fill in competitor figures
The exact questions to request in writing from any vendor before completing a warranty cost comparison
Published UTAH-400 Series 2 power draw and rack footprint figures by frame size
A summary page that transfers your totals into one 10-year comparison table

Get your free worksheet

Delivered instantly. No sales call required.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Optional Opt-In

No spam. Unsubscribe anytime. We'll also send two short follow-ups on where the hidden costs usually hide.

"The first and most important element in our decision to renew with Utah Scientific was our current router's dependability. It ran 24/7, 365 for nine years, with no failures." — Craig Jutson, City of San José

What's inside

Three Steps to a Defensible TCO Number

1

Request Written Warranty Terms

Service mode, freight responsibility, parts vs. labor, and software coverage in writing, from every vendor.

2

Run the Power & Rack Worksheet

The most underestimated variables in broadcast infrastructure TCO, using your facility's actual kWh rate and rack cost.

3

Contact Utah Scientific

Bring your completed worksheet to a product specialist to validate assumptions against published specs.